The ABC’s of Conventional Tennis Court Construction
By Bill Narozanick
When looking to build a tennis court facility, owners should do research and look for opportunities to maximize what they’re getting for their investment. As such, we’ve put together this article on the ABC’s of tennis court construction; What to look out for, how to build it, and how to care for your facility even after it’s built.Recommended Qualifications
- Qualifications
- Designer – Adequate experience and knowledge in the construction of tennis court facilities, including soils analysis, drainage (basic and interceptor), base construction, asphalt paving, surfacing, and accessories.
- Contractor – Adequate experience and knowledge as described above and hopefully significant experience with laser technology.
- Bid Qualifications – As New Jersey relies on low qualified bidders, it is important to know that this policy does little to protect an owner. Quite often you have contractors entering the market with little or no experience, especially in difficult economic times, that have the appropriate bonding and documents. These contractors will win a bid but have no ability to complete the job as designed or intended. It is an owner’s obligation to protect the taxpayer and ensure that the project is performed to optimal standards. To do this, it is extremely important that the owner include requirements in the bid qualifications that best protect their interest without unreasonably or unfairly minimizing the bidder pool. One example of good qualifications might be, “…the Contractor must be in good standing as a member of the American Sports Builders Association (ASBA) and have constructed, at minimum, 10 complete tennis courts each year over the past 3 years. In addition, it is required that the contractor have significant experience with laser-controlled technology and be able to verify that they have constructed, at minimum, 20 tennis courts utilizing laser-controlled technology.”
Necessary Construction Basics
- Construction Basics
- Soils Analysis – Hire an independent testing firm to evaluate the existing site conditions and determine if any modifications need to be made for an optimal, free-draining site.
- Drainage – Construct as per independent testing firm recommendations. May consider typical storm drainage with an interceptor component.
- Base Construction – Construct a stone base (of 6-8”) utilizing laser-controlled equipment.
- Asphalt Pavement Construction – Heavy duty asphalt pavement specification (Minimum 4” base asphalt and 1.5” surface asphalt utilizing local DOT asphalt mixtures) constructed utilizing laser-controlled equipment.
- Surfacing – Apply an appropriate water-based and sand-filled acrylic latex products that will give protection, high performance, and longevity.
- Expansion Joints – Although most asphalt tennis courts are constructed with no expansion joints, there are some engineers/designers who believe strongly that including saw-cut expansion joints help control the cracking that tennis courts inevitably experience. Contractors should have experience with whatever method the engineers/designers opt for.
- Accessories – Add items such as fencing, bleachers, lighting, walkways, wind-screens, etc. to enhance the facility and the experience.
Care and Maintenance
- Maintenance
- Resurface – Resurface every 3-7 years, depending upon use of the facility.
- Crack Repair – Although there is no permanent solution to crack repair, there are products in the marketplace that either fill the crack, cover the crack, or cover the entire tennis facility to act as a buffer between the continual contraction and expansion of the cracks and the playing surface. Some of these systems are relatively successful and may want to be considered as an alternative to significant renovation or reconstruction. Please view some of these product documents on our website, under the Tennis Courts Project Resources tab in the Smart Start Toolbox!
- Grass Encroachment – In many cases, grass and turf have a habit of growing higher than the asphalt or concrete curb edge, resulting in ponding at the edge of the courts towards the low end. It is important for an owner to adjust the turf as necessary to ensure proper runoff of the facility.
A Major Issue
- A Major Issue Associated with Asphalt Tennis Court Construction
- Contaminants – Contaminants in the asphalt mixture, such as clay balls, silt balls, pyrites, oil, etc. that cannot be controlled by the contractor can reduce the performance and longevity of your new tennis court facility. When a contractor buys local DOT approved asphalt for highways and parking lots, it may have these contaminants, which will be detrimental for the relatively thin layers of coatings that the tennis court will receive. These contaminants will result in small holes, etc. and through the freeze-thaw cycles, they will result in the reduced longevity, performance, and aesthetics of the facility. The best way to safeguard against contaminant issues is to contact the asphalt supplier, explain your needs for a high quality “virgin mix” with no use of recycled products and clean or washed raw materials. These suppliers should understand exactly what you’re talking about and be willing to assist you.