SORT BY: Blogs|News
Blog: Blog

Why Synthetic Tracks Reduce Injuries for Runners

Combining speed, technique, dedication, and team building, running helps people of all ages feel a sense of accomplishment, and choosing the right running track surface makes all the difference. Aside from assisting runners in achieving their

Read More
Blog: Blog

How Often Should a Running Track Be Resurfaced?

A damaged athletic surface isn’t just an aesthetic issue – it can pose a safety hazard for your athletes. After several years of regular use, you may need to resurface your school’s running track to keep it in good working order. Learn more in

Read More
Blog: Blog

How Long Does It Take to Install Artificial Turf?

If your athletic facility needs a major update or renovation, you may be wondering about how sports field construction works. Installing artificial turf fields, running tracks, or tennis courts requires a qualified, experienced contractor who

Read More
Blog: Blog

Choosing the Right Surface for a Multi-Use Field

As an athletic director or business director for a school, it is your responsibility to keep your facilities safe for the players while maintaining the appearance and appeal of your school. Multi-use fields can play a pivotal role in a school’s

Read More
Blog: Blog | News

Preventing Cracks in Your Tennis Court and Why It’s Important

To ensure your tennis court maintains its beautiful look and quality playing surface, certain precautions need to be taken. For over 40 years, American Athletic Track and Turf has proudly provided beautiful tennis courts and tennis court

Read More

What Our Clients Say

  • We chose AACI to work on 3 different running track and sports construction projects. In all instances AACI’s work ranks as the BEST example in sports construction I have ever witnessed in my 33 years in this industry.

    John Bell, PE
    President, Kinsey Associations,
    Park & Recreation Consultants
  • Upon final inspection of Bucknell University’s new asphalt pavement for their 2012 running track project, Geoff Daley exclaimed: “In 20+ years of synthetic track surfacing, I have not seen asphalt paved to that precision and consistency.

    Geoff Daley, CTB
    Chief Estimator and Director of Quality Assurance
Call
Quote