SORT BY: Blogs|News
Blog: Blog | News

The ABCs of Tennis Court Construction

If you’re thinking about constructing a tennis court, it’s important to do research and hire trusted experts to ensure satisfaction and maximize your investment. At American Athletic Track and Turf, our dedicated team has been providing tennis

Read More
Blog: Blog | News

Artificial Turf 101

Choose artificial turf for your athletic field to eliminate lost playing time, excessive maintenance, and other hassles of natural turf. American Athletic Track and Turf has been installing high-quality artificial turf for schools, universities,

Read More
Blog: Blog | News

Choosing the Right Surface for Your New Tennis Court

Whether you’re opening a new facility and want a high-quality tennis court for your student-athletes or want to repair or upgrade your existing court, you should know that there’s more than one choice when it comes to your options for tennis

Read More
Blog: Blog | News

The Benefits of Switching From Natural Grass to an Artificial Surface

Since their inception, sports have been played anywhere there was an open field. To this day, a sprawling grass field is an invitation to drop what you’re doing and play a pickup game. Natural grass has always been a go-to athletic surface for

Read More
Blog: Blog | News

Soft or Hard? Choosing the Proper Track Surface

In almost every sport, athletes are seen running back and forth for hours on end in a stunning display of their physical abilities and stamina. But how did they get to that level of performance? Aside from a lot of discipline, one of the most

Read More

What Our Clients Say

  • We chose AACI to work on 3 different running track and sports construction projects. In all instances AACI’s work ranks as the BEST example in sports construction I have ever witnessed in my 33 years in this industry.

    John Bell, PE
    President, Kinsey Associations,
    Park & Recreation Consultants
  • Upon final inspection of Bucknell University’s new asphalt pavement for their 2012 running track project, Geoff Daley exclaimed: “In 20+ years of synthetic track surfacing, I have not seen asphalt paved to that precision and consistency.

    Geoff Daley, CTB
    Chief Estimator and Director of Quality Assurance
Call
Quote