SORT BY: Blogs|News
Blog: Blog

Why American Athletic Chooses FieldTurf Products

At American Athletic Track and Turf, our work has earned us numerous awards and the reputation of being the premier artificial turf field builder on the East Coast. With over twenty-five years of experience in this industry, we understand the

Read More
Blog: Blog

What to Know When You Want to Build an Asphalt Tennis Court

Asphalt tennis courts are playing surfaces that can deliver beauty and function to any sports facility. However, if not installed correctly, they can become the source of many headaches. To avoid potential problems down the line, athletic

Read More
Blog: Blog

How Track Surface Materials Impact Running Performance

Have you ever noticed a runner performs better on a certain track? While there could be several reasons why, one you might not have thought of is the type of track surface material. Various types of running track surfaces affect how a runner

Read More
Blog: Blog

What You Need to Know About Installing an Athletic Running Track in Florida

With ideal weather conditions year-round, Florida is a prime location for outdoor sports. One of the most popular outdoor activities to engage in is running. However, when building an athletic running track in Florida, athletic directors of

Read More
Blog: Blog

Running Track Polyurethane or Latex Binder

When it comes to running track surfaces, you may think they’re all the same, and that enhancing your facility entails a one-size-fits-all solution. However, athletic and business directors wishing to upgrade their running track material

Read More

What Our Clients Say

  • We chose AACI to work on 3 different running track and sports construction projects. In all instances AACI’s work ranks as the BEST example in sports construction I have ever witnessed in my 33 years in this industry.

    John Bell, PE
    President, Kinsey Associations,
    Park & Recreation Consultants
  • Upon final inspection of Bucknell University’s new asphalt pavement for their 2012 running track project, Geoff Daley exclaimed: “In 20+ years of synthetic track surfacing, I have not seen asphalt paved to that precision and consistency.

    Geoff Daley, CTB
    Chief Estimator and Director of Quality Assurance
Call
Quote